Texas Instruments TPS2640EVM eFuse Evaluation Module (EVM) allows reference circuit evaluation of the TPS2640 devices. The Texas Instruments TPS2640 is compact 4.2V to 42V, 2.23A industrial eFuses with integrated back-to-back FETs, programmable under voltage, overvoltage, and reverse-polarity features. It also has overcurrent, in-rush current protection, and output current monitoring features.

Features

  • 4.2V to 42V input operating voltage range
  • 0.2A to 2.23A jumper-programmable current limit
  • Reverse polarity protection up to –42V
  • Programmable input UVLO
  • Selectable overload fault response (auto-retry, latch, and circuit breaker)
  • Programmable input overvoltage protection (OVP) cut off
  • Programmable VOUT slew rate control
  • Load current monitor output with 1.5V/A
  • Optional onboard transient protection devices like input TVS and output Schottky diodes
  • Onboard reset switch and fault indicators

Required Equipment

  • Power Supplies
    • One adjustable power supply: 0V to 42V output, 0A to 3A output current limit
  • Meters
    • One DMM minimum needed and may require more if simultaneous measurements are required
  • Oscilloscope
    • A DPO2024, or equivalent with three 10x voltage probes and one DC current probe
  • Loads
    • One resistive load which can tolerate up to 3A DC load at 24V

Applications

  • HMI power protection in factory automation
  • Fire safety systems
  • Electronic thermostats and video doorbells
  • Industrial PCs

Test Setup

Mechanical Drawing - Texas Instruments TPS2640EVM eFuse Evaluation Module (EVM)