Texas Instruments TMAG5328EVM Hall-Effect Switch Evaluation Module

Texas Instruments TMAG5328EVM Hall-Effect Switch Evaluation Module (EVM) is an easy-to-use platform to evaluate the main features and performance of the TMAG5328. The TMAG5328 is a resistor-adjustable, low-power Hall-effect switch. This evaluation module includes a magnet and a Texas Instruments TMAG5328 daughter board. Also included is a head-on linear displacement module to demonstrate the head-on linear displacement function.

Features

  • GUI-controlled DAC option for dynamically setting the internal magnetic threshold sensitivity (BOP)
  • Nonvolatile memory within DAC stores BOP for future operation without a processor
  • Potentiometer option for dynamically setting BOP
  • Resistor footprint for creating a static BOP
  • LED on TMAG5328 output for visual inspection of switch’s output state
  • Head-on linear displacement module for a demonstration of the head-on linear displacement function

Kit Contents

  • TMAG5328EVM evaluation module
  • Handheld magnet
  • Head-on Linear Displacement 3D print module

Board Layout

Mechanical Drawing - Texas Instruments TMAG5328EVM Hall-Effect Switch Evaluation Module
Opublikowano: 2022-04-29 | Zaktualizowano: 2023-10-27