Texas Instruments INA2191EVM Evaluation Module

Texas Instruments INA2191EVM Evaluation Module is configured to evaluate the operation of the INA2191 dual-channel, high-input impedance current sense amplifier. The TI INA2191EVM Evaluation Module includes onboard sockets and pads for easy and complete configuration and testing. Headers and jumpers allow quick setting of the device's reference voltage and enable pins.

Features

  • Pins are easily measured with test points
  • Pads, headers, and sockets allow for custom and convenient device interfacing for user-specific applications
  • Quick-fit connectors make for a strong connection to a load when testing the device with a shunt resistor and loads of several amps

Front & Back Layout

Texas Instruments INA2191EVM Evaluation Module
Opublikowano: 2021-07-14 | Zaktualizowano: 2023-08-29