Texas Instruments bq25883EVM Evaluation Module

Texas Instruments bq25883EVM Evaluation Module is a platform for evaluating the performance of the bq25883. The bq25883 is a highly integrated 2A boosting, 1.5MHz switch-mode battery charge management with dynamic power-path management for 2s Li-ion and Li-polymer batteries.

The Texas Instruments bq25883EVM Evaluation Module is a complete charger module for evaluating the I2C-controlled, 2s battery NVDC charger in the QFN package. The Power Path Management allows Instant-on and works with no battery or a deeply discharged battery. The bq25883EVM includes onboard test points, sense resistors, and jumpers facilitating measurement of high-efficiency and high-accuracy voltage and current regulation.

Features

  • Easily evaluate the high-efficiency 2A, 1.5MHz integrated field-effect-transistor (FET), switch-mode
  • Onboard test points, sense resistors, and jumpers facilitate the measurement of high-efficiency and high-accuracy voltage and current regulation
  • Onboard USB input adapter for connecting to USB source and communication using the D+/D- function to set default input current limit
  • Power Path Management allows Instant-on works with no battery or deeply discharged battery

Charge Mode Test Setup

Schematic - Texas Instruments bq25883EVM Evaluation Module
Opublikowano: 2019-05-15 | Zaktualizowano: 2023-09-11